Harvey Stone Pavilion Restoration

Lewis Contractors, in partnership with Marshall Craft Associates, restored the Harvey Stone Pavilion at McDaniel College, revitalizing a cherished historic campus landmark while transforming it into a functional outdoor classroom supporting the college’s environmental science curriculum. The project combined historic preservation, structural reconstruction, and new site infrastructure — showcasing Lewis’s ability to deliver complex, detail-driven work that honors the past while serving contemporary needs.

Originally constructed in 1934, the pavilion and its iconic stone fireplace have long anchored student gatherings, alumni events, and campus traditions. The original scope called for roof deck replacement, but a thorough initial inspection by the Lewis superintendent revealed extensive rot throughout the roof framing system — particularly at every rafter connection to the historic chimney. This early discovery prompted a decisive expansion of scope to full structural roof reconstruction, preventing further deterioration and protecting the long-term integrity of the landmark.

Preserving the historic fireplace while rebuilding the roof required creative engineering developed collaboratively with Marshall Craft Associates. Lewis designed and fabricated a custom steel saddle to bear directly on the chimney and support the new roof framing. The upper chimney masonry was carefully dismantled, the saddle installed, and the chimney crown reconstructed using locally sourced reclaimed stone selected to match the original 1934 masonry — seamlessly integrating modern structural support with historic character. New Southern Yellow Pine rafters, each approximately 26 feet in length, were hoisted by forklift and set by carpenters working from a custom scaffolding platform built around the chimney.

Throughout the project, Lewis self-performed the carpentry scope, enabling tighter quality control and faster adaptation to unforeseen field conditions. The cedar shingle roof required meticulous hand-cutting and mitering at each hip to replicate traditional craftsmanship. The original old-growth cedar posts — dating to 1934 — were carefully preserved in place, maintaining an authentic material connection to the pavilion’s origins.

A significant site challenge involved installation of the pavilion’s sewer connection via directional boring across more than 1,500 linear feet beneath multiple fairways of an adjacent golf course — all while the course remained fully operational. Precise coordination and scheduling ensured zero disruption to golfers and campus activities.

The completed project also introduced a new restroom and storage building, accessibility improvements, and a future plant garden, fully equipping the pavilion as an outdoor academic environment. The Harvey Stone Pavilion now stands as a testament to Lewis Contractors’ craftsmanship, field leadership, and commitment to preserving the places that define a community.

Year
2025
Location
Westminster, MD
Categories
Previous ProjectNext Project

60 years of Lewis 1

Follow our latest achievements and information on our social networks

Lewis Contractors

55 Gwynns Mill Court

Owings Mills, MD, 21117

Copyright © 2026 Lewis Contractors